The 200klt tank is in!!!
The tank has been installed and is all hooked up with new storm/drain pipes from the house and main garage. We have had some rain and emptied some of our smaller tanks into the new one so it is now just over half full!!!
The tank has been installed and is all hooked up with new storm/drain pipes from the house and main garage. We have had some rain and emptied some of our smaller tanks into the new one so it is now just over half full!!!









FacebookLinkedIn A bit of night painting to get rid of the old mission brown everything!
FacebookLinkedIn 2 part coating went onto the shed floor for looks and practicality.
FacebookLinkedIn Getting rid of the wood panelling to allow new front door to go in when it arrives.
FacebookLinkedIn So we cleared the old veggie patch and have ordered the tank, so now we need to get started on the earthworks. 40 cubic metres of sand!
FacebookLinkedIn This is the beginning of the bon fire!!