Sand arrives for BIG tank pad

So we cleared the old veggie patch and have ordered the tank, so now we need to get started on the earthworks. 40 cubic metres of sand!

Through the front gates
First load
How high does the tray go up?
And off to get the second load
Two loads done. Doesn’t really look like that much

About the author

Jodee Hartley

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

Copyright © 2021 Created by SimplifyingIT Powered by WordPress.