Sand arrives for BIG tank pad

So we cleared the old veggie patch and have ordered the tank, so now we need to get started on the earthworks. 40 cubic metres of sand!

Through the front gates
First load
How high does the tray go up?
And off to get the second load
Two loads done. Doesn’t really look like that much

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *